Copedal

Memory & knowledge

Project retrospective

Collect the evidence, attribute each defect, and output a change table instead of a report.

project-retro 205 lines · 15 KB

Inside this skill

  1. 0. Division of labour between the three skills (do not mix them up)
  2. 1. Six stages (**the order cannot be skipped, above all do not jump to B**)
  3. 2. Hard gates (seven)
  4. 3. Success retrospective branch (**successes get a retrospective too**)
  5. 4. Anti-patterns (six reasons retrospectives fail)
  6. 5. Trigger timing
  7. 6. Reference sources (external projects, **borrow the method, not the code**)
  8. Working discipline (three hard rules, **read before changing anything**)

This page is generated from the skill document itself. The outline below is that document's own structure, translated headings included.

How to use it

  1. Download the file below — it is a single SKILL.md.
  2. Put it in the skills folder your agent reads, in a directory named project-retro.
  3. Start a message with the trigger from the description, or name the skill directly.
Download the skill file (.md)