Memory & knowledge
Project retrospective
Collect the evidence, attribute each defect, and output a change table instead of a report.
Inside this skill
- 0. Division of labour between the three skills (do not mix them up)
- 1. Six stages (**the order cannot be skipped, above all do not jump to B**)
- 2. Hard gates (seven)
- 3. Success retrospective branch (**successes get a retrospective too**)
- 4. Anti-patterns (six reasons retrospectives fail)
- 5. Trigger timing
- 6. Reference sources (external projects, **borrow the method, not the code**)
- Working discipline (three hard rules, **read before changing anything**)
This page is generated from the skill document itself. The outline below is that document's own structure, translated headings included.
How to use it
- Download the file below — it is a single
SKILL.md. - Put it in the skills folder your agent reads, in a directory named
project-retro. - Start a message with the trigger from the description, or name the skill directly.